|
|
|
|
|
|
|
|
- (1)
- (1)
- (1)
- (1)
- (4)
- (1)
- (2)
- (1)
- (1)
- (1)
- (1)
|
|
|
|
|
Build Your Online Product Catalogs?
Product Name: |
Tiger mixing station, station installation, mixing station basic
|
Supply Ability: |
500 sets |
Related proudcts |
|
Specifications |
4300*2400 |
Price Term: |
Direct quotation |
Port of loading: |
|
Minimum Order |
1 |
Unit Price: |
85000 |
|
Concrete mixing station on-site commissioning debugging basic steps to concrete mixing station can be divided into the following ten areas: power ark and work station, belt transmission system, electronic measuring system, aggregate stand batching system, powder ingredients, additives and water weighing system, mixer and the dust removal system, air compressor, computer and interface, overall debugging. A. Power ark and work station debugging: 1. Check whether the three-phase power supply is stable balance, without phase (see voltmeter); 2. Check the circuit, whether there is a short circuit to ground, fault phenomenon, check the wiring of rationality; 2.1 controlled electrical drawing check whether components model, arrangement; 2.2 the multimeter to check whether there is short circuit, circuit fault phenomenon, if there is a short circuit or there is doubt, should find out the problem completely, to the next step of work; 2.3 use 500 v shake table to check the insulation of the motor, if there is the phenomenon; 2.4 test among 100 line resistance is not greater than 1 o; 2.5 check grounding line contact is good, strong; 2.6 whether the sensor signal lines away from the large current line as far as possible; 2.7 check the power all the electrical components contained in the electrical parameters. 3. Check the correctness of the circuit: 3.1 all the circuit breaker, fuse disconnect; 3.2 close the main circuit breaker QF, through to fuse FU1, FU2 after closed to control the power switch S0, check whether the transformer output is normal; 3.3 check the 24 v output switching power supply is normal; 3.4 one by one through to fuse, PLC electrical, panel power light work, weighing instrument electric; 3.5 observe whether all components have a fever, is there a focal flavour; 3.6 control principle diagram with a multimeter examines each voltage is accurate; 4. Check the correctness of the PLC input section lines; 4.1 place of PLC in the "STOP" position; 4.2 inspect all panel knob switch, push button switch and the a |
Company: |
Build a tiger trade co., LTD
|
Contact: |
Mr. snow dai |
Address: |
jixian |
Postcode: |
301900 |
Tel: |
86-18602600417 |
Fax: |
022-82343338 |
E-mail: |
|
|
|