|
|
|
|
|
|
|
|
- (1)
- (1)
- (1)
- (1)
- (4)
- (1)
- (2)
- (1)
- (1)
- (1)
- (1)
|
|
|
|
|
Build Your Online Product Catalogs?
Product Name: |
Build the tiger 6 anniversary of Changqing, big price profession
|
Supply Ability: |
1000 |
Related proudcts |
|
Specifications |
1200 |
Price Term: |
fob |
Port of loading: |
|
Minimum Order |
1 |
Unit Price: |
|
|
August 15th -8 31, built 6 anniversary of the co***ny's anniversary, the mold price of ten percent, the machine naked price ex factory, welcome customers to come to consult the purchase The first point: sheet machine mould is built of tiger Q345B (16 Mn), manganese steel is characterized by strong rigidity, pressure, seismic. The second point: in fact, the quality of brick mold mainly lies in machining and heat treatment, tiger mold machining is using wire cutting technology, using high precision NC machining equipment as the core, full computer control to ensure the surface flatness, reduces the cutting surface form error, the more accurate size. The third point: mold heat treatment construction tiger are outsourced, we do not do the heat treatment, each set of molds are sent to the contracted professional heat treatment co***ny, some customers may ask why the tiger mold production cycle is long, I can answer you this question, built brick mold production time tiger in 15 days, used in machining and heat treatment time on time in half, to guarantee that the service life of the mold are sent to heat treatment, was sent to the vacuum environment for heating (in order to prevent the destruction of his hollow in its atomic structure, heating) 800-900, time is 8-12 hours, high temperature carburizing with kerosene (the surface of steel plate after the high temperature increase, the kerosene carbon atoms injected into the body, the purpose is to increase its stability and rigidity , the characteristics of kerosene is the containing carbon) was the highest, carburized layer must reach 1.2 1.5 mm, whole journey is computer control (to prevent artificial carburizing to produce error), through such a high temperature carburizing, to ensure the uniformity on the surface of carbon atoms and co***ctness. The fourth point: after heat treatment, in 200 degrees of ***ce, 8-10 hours cooling (to ensure that in the cooling process in the mold does not deform), after heat treatment, we have professional and technical personnel |
Company: |
Build a tiger trade co., LTD
|
Contact: |
Mr. snow dai |
Address: |
jixian |
Postcode: |
301900 |
Tel: |
86-18602600417 |
Fax: |
022-82343338 |
E-mail: |
|
|
|