|
|
|
|
|
|
|
|
- (1)
- (1)
- (1)
- (1)
- (4)
- (1)
- (2)
- (1)
- (1)
- (1)
- (1)
|
|
|
|
|
Build Your Online Product Catalogs?
Product Name: |
Brick machine fittings factory, cement block machine mold, (the
|
Supply Ability: |
2000 |
Related proudcts |
cement block machine, |
Specifications |
1150 |
Price Term: |
fob |
Port of loading: |
|
Minimum Order |
1 |
Unit Price: |
11000 |
|
Customer: hello, this is built in tianjin tiger trading co., LTD., the co***ny is the main baking-free brick machine, brick machine parts, mold, and the brick machine equipment. Floor tile equipment sales, rushing to buy, there are more and more customers do floor tile, such as bread brick, lu yanshi, bricks, planting grass lawn brick, such as a series of road brick demand is also increasing, as the demand of the social demands of things people, aesthetic is becoming more and more high, some new customers have orders but because obviously never done a similar brick to order, if you have such a demand can consult mould co***ny and your equipment manufacturer, you can also come to our co***ny consulting, we accept all kinds of mold orders now, what you have never seen or don't know how to do the cement brick mold, can be customized to our co***ny. Brick machine fittings factory, cement block machine mold, (title) of the Olympic Games to build tiger would die custom built brick machine mold and the selling points of advantage: Built the first point: tiger the plank brick machine mould is Q345B (16 mn), the characteristics of manganese steel is strong rigidity, compression, the earthquake. The second point: in fact brick machine mould mainly depends on the quality of machining and heat treatment, build the tiger mould machining is the wire-cutting technology, using high precision CNC and industrial equipment as the core, the entire computer control, ensure that the surface roughness, reduces the error of cutting surface, make the size more accurate. The third point: build tiger mold heat treatment is outsourced, we don't do heat treatment, each set of mold heat treatment are sent to the specialized contracting co***ny, some customers might ask, why tiger mold production cycle is long, build tiger brick machine mold production time is within 15 days or so, in the machining and heat treatment on the time of the time in more than half, in order to ensure the service life and die after sent to heat treatment, was s |
Company: |
Build a tiger trade co., LTD
|
Contact: |
Mr. snow dai |
Address: |
jixian |
Postcode: |
301900 |
Tel: |
86-18602600417 |
Fax: |
022-82343338 |
E-mail: |
|
|
|